Die casting the first mock examination multi cavity runner balance, heat balance, flow balance, timing balance control

  • мнения: ...
  • Время выпуска: 2026-11-07

Die casting the first mock examination multi cavity runner balance, heat balance, flow balance, timing balance control
The first mock examination with multiple cavities is the mainstream solution to improve production capacity and reduce the cost of a single piece. Many multi cavity molds have good single cavity yield. When multiple cavities are hit together, some cavities are full of material and some cavities are cold shut. The root cause is the imbalance of flow channels.
1、 Two balance strategies: geometric balance vs. process balance
Geometric balance: The length and cross-section of each branch channel are completely consistent, symmetrically arranged, prioritized for selection, and easy to debug; Process balance: The length of the flow channel varies, and the flow rate is compensated by changing the cross-section and resistance, which is suitable for situations where the product size is different and the layout is limited. Few the first mock examination multi cavity alloy wheel hubs are used, and small shells and connectors are widely used.
2、 Core principle of traffic balance
The volume and arrival time of aluminum liquid allocated to each cavity should be as consistent as possible; The cavity that is filled first cannot be sealed in advance to prevent overflow and exhaust; The resistance along each branch should be as close as possible. Even with geometric symmetry, the distal branch dissipates heat faster, but there may still be hidden imbalances.
3、 Thermal equilibrium is more easily overlooked than flow equilibrium
The temperature of the flow channel near the material barrel is high, and the heat dissipation of the distal flow channel is fast; The proximal cavity is prone to aluminum adhesion and shrinkage, while the distal cavity is prone to cold insulation. Countermeasure: Partition independent waterways, add cooling near the end, and provide moderate insulation at the far end, combined with CAE thermal simulation verification.
4、 Typical phenomenon of imbalance
Individual cavities are short of materials and have cold insulation; Individual cavity pores and curled air; The yield of each cavity varies, and the yield of the same set of molds is uneven; The wear rate of the sprue varies greatly.
5、 Debugging and mold modification methods
Prioritize adjusting the thickness and width of the sprue to change the resistance; Secondly, adjust the overflow capacity; Finally, modify the cross-section of the flow channel. It is not recommended to rely solely on injection parameters to forcibly flatten, as compromising parameters will result in a decrease in the yield of all cavities. Low pressure casting hardly makes the first mock examination with multiple cavities, so the filling pressure is low and the balance is extremely difficult. Google's "die casting multi capacity runner balance" is aimed at mold designers.
FAQ
Does geometric symmetry necessarily mean balance?
Not necessarily, the difference in heat dissipation between near and far leads to thermal imbalance.
2. Is it reliable to balance the process with the same mold for both large and small parts?
Sure, but the process window is narrow and the parameters become imbalanced as soon as they change.
3. Can the first mock examination with multiple cavities and exhaust grooves be designed uniformly?
Each cavity has independent overflow and independent exhaust, do not share exhaust.
4. Should full cavity CAE simulation be performed for multi cavity molds?
Must, single cavity simulation results cannot be directly applied.
What is the reason why the proximal cavity is more prone to shrinkage and loosening?
Aluminum liquid has a higher temperature, slower solidification, and insufficient hot spot shrinkage pressure.
6. After adjusting the balance of the flow channel, will changing the alloy cause imbalance?
Yes, changes in liquidity and resistance characteristics require fine-tuning.
7. Do we need to synchronize the ejection of multi cavity molds?
The ejection must be synchronized, otherwise the casting will be pulled or deformed.
8. How many times does the cost of the first mock examination with multiple cavities exceed that of a single cavity?
Higher than a single cavity and lower than a simple multiple, the design time for flow channels and balance increases.

сайт: https://ru.zj-xinfeng.com/news/1446.html
Не могу найти никакого контента

Get a Custom Product Proposal Online

Please fill out the form below to receive this for free.

Global Hotline:

+86-15356852630,13967513266

Формы для литья под низким давлением (LPDC) 
Формы для гравитационного литья 
Формы для литья под противодавлением (CPC) 
Формы для литья конструкционных деталей
Форма для литья ступицы колеса мотоцикла
Форма для литья ступицы колеса под дифференциальным давлением
Форма для гравитационного литья ступицы колеса
Форма для литья ступицы колеса под низким давлением

ФОРМЫ ДЛЯ АВТОМОБИЛЬНЫХ КОЛЕС 
КОНСТРУКЦИОННЫЕ ДЕТАЛИ ДЛЯ АВТОМОБИЛЕЙ 
ДРУГИЕ АЛЮМИНИЕВЫЕ ЛИТНЫЕ ДЕТАЛИ

НОВОСТИ КОМПАНИИ
НОВОСТИ ОТРАСЛИ
ТЕХНИЧЕСКИЙ БЛОГ
ЧАСТО ЗАДАВАЕМЫЕ ВОПРОСЫ

ПРОФИЛЬ КОМПАНИИ
ОРГАНИЗАЦИОННАЯ СТРУКТУРА
ИСТОРИЯ РАЗВИТИЯ
ИНТЕЛЛЕКТУАЛЬНАЯ СОБСТВЕННОСТЬ
КОМАНДНЫЙ ДУХ И ПАРТНЕРЫ

Авторские права © Zhejiang Xinfeng Machinery Co., Ltd. Все права защищены.